SURFACE PREPARATION FOR EXCHANGE RECONDITIONED BARS

ACRYLIC

1. If applying an acrylic top coat use P400-P600 grade paper to rub down the bar.
OR. You may use a light grade scotchbrite to rub down the bar.
2. Clean surface with soapy warm water only. DO NOT USE prepsol on exchange bars.
3. Drying times may vary under different conditions. Recommended time is 20 minutes at 45 C.

TWO PACK

1. If applying a two pack top coat use P600-P800 grade paper to rub down the bar.
OR. You may use a light grade scotchbrite to rub down the bar.
2. Clean surface with soapy warm water only. DO NOT USE prepsol on exchange bars.
3. Drying times may vary under different conditions. Recommended time is 20 minutes at 45 C.


Google SitemapSites we would recommend